Showing posts with label linen closet. Show all posts
Showing posts with label linen closet. Show all posts

Wednesday, October 9, 2013

Bathroom Linen Closet Door


We have been working on the bathroom for a couple of weeks now.  We had a really ugly medicine cabinet over the sink.  We took it down and decided to replace it with just a mirror.  Since we no longer had this space, we had to figure out a place to put the items that had been in it.  I didn't just want to place them in  the linen closet, because I figured all the little things would just get lost in there.  So, I went on a thrift store hunt (along with the rest of my hunting items) and found the two little boxes, the wire basket and the shower holder.  Altogether, I spent $5.00. 



My dear husband drilled holes into the linen closet and we hung the boxes and wire basket on them.  He had to cut off the top part of the shower caddy.  We decided not to use the wire basket (I didn't like the way it looked).






This was a simple and very inexpensive job.  You can get very creative with this.  I love these little shelves and it will certainly make things easier!!!




Bathroom Makeover, Day 11


It's Day 11 and we are almost done.... I think.  Do you remember the tiles on the floor?  Well, here's a picture to remind you.




We used the same glass tiles we used on the floor for the back splash as well.  I was very fortunate to have my dear husband, Robert, work on the back splash, while I was out garage sale shopping.

He used his drummel tool to cut the edges of the tiles that would be on the two edges.  The tiles were not attached to each other, but had a paper on them that kept them together in rows.  The process was basically the same as putting the tiles on the floor.  He used the premixed thin set and applied it to the wall with a trowel.  He started on the ends and put the tiles on.  After he was done, he removed the paper on them, so he could put the spacers on.  He used a piece of wood on the bottom, to separate the tiles from the counter.



He did a great job!  I can't wait to see how it looks, once it is grouted!




So, I didn't completely escape from chores today.  When I got home, I did all the caulking.  We have a caulking gun, but I prefer to use the ones in the tube.  It's really not hard to do.  I simply ran the caulk down the area I was working on.  Then, I wet my finger in the water and went across the area to even it out.   I keep a rag nearby, in case I need to make any clean ups.

 






Last thing to do today was to fix the linen closet.  Since we removed the medicine cabinet, we needed a place to put the items that had been in it.  I didn't want to put them in the closet, where they would just get buried. So, we hung up a shower caddy and 2 little boxes to put things in.  We just screwed them into the door.  I spent $4.00 at thrift stores on these items.





Well, I'm pretty pleased with Day 11.  We have come a long way and it is starting to feel like a new bathroom.  I'm excited to have come this far and can't wait to have it all completed!